FCT Project PTDC/EGE-GES/099741/2008

 

Team International Journal Publications

 

[J19] L.A.C. Roque, D.B.M.M. Fontes, and F.A.C.C. Fontes. Bi-objective unit commitment problem: solving the Pareto frontier using BRKGA SPEA2 NPGA and NSGA II, submitted to international journal, 2013.

[J18] M. Oliveira, D.B.M.M. Fontes, T Pereira. Evaluation of Vehicle Painting Plans in an Automobile Assembly Plant Using an Integrated AHP-PROMETHEE Approach, submitted to International Transactions in Operational Research, 2013.

[J17] M. Oliveira, D.B.M.M. Fontes, Multicriteria Decision Making: A Case Study in the Automobile Industry, accepted for publication in Annals of Management Science

 [J16] L. A.C. Roque, D. B.M.M. Fontes, and F. A.C.C. Fontes. A hybrid Biased Random Key Genetic Algorithm for the Unit Commitment Problem, under revision, Journal of Combinatorial Optimization, 2013.

[J15] M.S.R. Monteiro, D.B.M.M. Fontes, and F.A.C.C. Fontes. Hop-constrained Minimum Spanning Tree Problems in Nonlinear Cost Network Flows: an Ant Colony Optimization Approach, under revision, Journal of Optimization Letters, 2013.

[J14] M.S.R. Monteiro, D.B.M.M. Fontes, and F.A.C.C. Fontes. Concave Minimum Cost Network Flow Problems Solved with a Colony of Ants, Journal of Heuristics 19, 1-33, 2013.

[J13] D.B.M.M. Fontes, J.F. Gonçalves. A Multi Population Genetic Algorithm for Hop-Constrained Trees in Nonlinear Cost Flow Networks. Optimization Letters 7, 1303-1324, 2013.

[J12] Jeffrey E. Schaller, Jorge M. S. Valente, A comparison of meta-heuristic procedures to schedule jobs in a permutation flow shop to minimize total earliness and tardiness, International Journal of Production Research 51, 772-779, 2013.

[J11] Jeffrey E. Schaller, Jorge M. S. Valente, An evaluation of heuristics for scheduling a non-delay permutation flow shop with family setups to minimize total earliness and tardiness, Journal of the Operational Research Society 64, 805-816, 2013.

[J10] M.R.A. Moreira and R.A.F.S. Alves, Input-output control order release mechanism in a job-shop: how workload control improves manufacturing operations, International Journal of Computational Science and Engineering 7, 214-223, 2012.

[J9] M.R.A. Moreira, S.R.S. Andrade, and P.S.A. Sousa International Outsourcing: A Process Approach for Apparel Industry submitted to international journal, 2012.

[J8] Jorge M. S. Valente, Jeffrey E. Schaller, “Dispatching Heuristics for the Single Machine Weighted Quadratic Tardiness Scheduling Problem”, Computers & Operations Research 39, 2223–2231, 2012.

[J7] Jeffrey E. Schaller, Jorge M. S. Valente, “Minimizing the weighted sum of squared tardiness on a single machine”, Computers & Operations Research 39, 919-928, 2012

[J6] Gomes TAF, Prudêncio RBC, Soares C, Rossi ALD, Carvalho A. Combining meta-learning and search techniques to select parameters for support vector machines. Neurocomputing 75(1), 3-13, 2012

[J5] J.N. Fidalgo, Dalila B.M.M. Fontes, Fostering microgeneration in power systems: the effect of legislative limitations, Electric Power Systems Research 84, 181-186, 2012.

[J4] Jorge Kanda, André Carlos Ponce Leon Ferreira de Carvalho, Eduardo R. Hruschka, Carlos Soares, Selection of algorithms to solve traveling salesman problems using meta-learning, International Journal of Hybrid Intelligent Systems 8 (3), 117-128, 2011.

[J3] J. M. S. Valente, M. R. A. Moreira, A. Singh e R. A. F. S. Alves, Genetic algorithms for single machine scheduling with quadratic earliness and tardiness costs International Journal of Advanced Manufacturing Technology 54, 251-265, 2011.

[J2] J. M. S. Valente, Beam Search Heuristics for Quadratic Earliness and Tardiness Scheduling, Journal of the Operational Research Society 61, 620-631, 2010.

[J1] J. M. S. Valente e J. E. Schaller, Improved Heuristics for the Single Machine Scheduling Problem with Linear Early and Quadratic Tardy Penalties, European Journal of Industrial Engineering 4, 99-129, 2010.

 

Home                    TOP                     Projects