|
|
Gonçalves,
J.F., Sousa, P. S. A., A genetic algorithm
for lot sizing and scheduling under capacity
constraints and allowing backorders,
International Journal of Production
Research, 1366-588X, Volume 49, Issue 9,
2011, 2683 – 2703. (ISI)
http://dx.doi.org/10.1080/00207543.2010.532936
Resende, M.G.C., Toso, R.F., Gonçalves, J.F.,
Silva, R.M.A., A biased random-key genetic
algorithm for the steiner triple covering
problem, Optimization Letters, 1-15, 2011.(ISI).
http://dx.doi.org/10.1007/s11590-011-0285-3
Festa, P., Gonçalves, J.F., Resende, M.,
Silva, R., Automatic Tuning of GRASP with
Path-Relinking Heuristics with a Biased
Random-Key Genetic Algorithm. Lecture Notes
in Computer Science - Experimental
Algorithms, 2010, 338-349.
http://dx.doi.org/10.1007/978-3-642-13193-6_29
Gonçalves, J.F., Resende, M.G.C., A biased
random-key genetic algorithm with
forward-backward improvement for the
resource constrained project scheduling
problem. Journal of Heuristics, 2010, (in
press). (ISI).
http://dx.doi.org/10.1007/s10732-010-9142-2
Gonçalves, J.F., Resende, M.G.C., Biased
random-key genetic algorithms for
combinatorial optimization. Journal of
Heuristics, 2010, (in press). (ISI)
http://dx.doi.org/10.1007/s10732-010-9143-1
Gonçalves, J.F., Resende, M.G.C., A parallel
multi-population genetic algorithm for a
constrained two-dimensional orthogonal
packing problem. Journal of Combinatorial
Optimization, 2010, (in press). (ISI)
http://dx.doi.org/10.1007/s10878-009-9282-1
Valente, J.M.S., Gonçalves, J.F., A genetic
algorithm approach for the single machine
scheduling problem with linear earliness and
quadratic tardiness penalties, Computers and
Operations Research, (2009), 36, 2707-2715,
2009, doi:10.1016/j.cor.2008.11.016. (ISI).
http://dx.doi.org/10.1016/j.cor.2008.11.016
Mendes,
J.J.M, Gonçalves, J.F., Resende, M.G.C., A
random key based genetic algorithm for the
resource constrained project scheduling
problem, Computers & Operations Research,
36, 92-109, 2009. (ISI).
http://dx.doi.org/10.1016/j.cor.2007.07.001
Gonçalves, J.F., Mendes, J.J.M., Resende,
M.G.C., A Genetic Algorithm for the Resource
Constrained Multi-Project Scheduling
Problem, European Journal of Operational
Research, 189, 1171-1190, 2008. (ISI).
http://dx.doi.org/10.1016/j.ejor.2006.06.074
|